Correction: I inserted the link to NISA in what should have been JAIF.
For reference here's Japan's Nuclear and Industrial Safety Agency (NISA)
The status report is fromrom the Japan Atomic Industrial Forum (JAIF):
| Status of reactors at 12:30 March 14 | 1 | 2 | 3 | 4 | 5 | 6 |
| Power output (MWe) | 460 | 784 | 784 | 784 | 784 | 1100 |
| Type of reactor | BWR-3 | BWR-4 | BWR-4 | BWR-4 | BWR-4 | BWR-5 |
| Status at earthquake | In service | In service | In service | Shut down | Shut down | Shut down |
| Fuel integrity | Damaged | Not damaged | Damaged | Not damaged | Not damaged | Not damaged |
| Containment integrity | Not damaged | Not damaged | Not damaged | Not damaged | Not damaged | Not damaged |
| Core cooling system 1 (ECCS/RHR) | Not functional | Not functional | Not functional | Not necessary | Not necessary | Not necessary |
| Core cooling system 2 (RCIC/MUWC) | Not functional | RCIC Working | Not functional | Not necessary | Not necessary | Not necessary |
| Building integrity | Damaged | Not damaged | Damaged | Not damaged | Not damaged | Not damaged |
| Environmental effect | 20 microSievert/hour at 11:44AM |
| Pressure vessel, water level | Unknown | Above core | Unknown | Safe | Safe | Safe |
| Pressure vessel, pressure | Stable | Stable | Stable | Safe | Safe | Safe |
| Containment pressure | Stable | Stable | Stable | Safe | Safe | Safe |
| Sea water injection | Suspended | To be decided | Performed | Not necessary | Not necessary | Not necessary |
| Containment venting | Performed | Preparing | Performed | Not necessary | Not necessary | Not necessary |
| Evacuation area | 20 km |
| INES | Level 4 (estimated by NISA) |
| Status of reactors at 20:30 March 14[43] | 1 | 2 | 3 | 4 | 5 | 6 |
| Power output (MWe) | 460 | 784 | 784 | 784 | 784 | 1100 |
| Type of reactor | BWR-3 | BWR-4 | BWR-4 | BWR-4 | BWR-4 | BWR-5 |
| Status at earthquake | In service | In service | In service | Shut down | Shut down | Shut down |
| Fuel integrity | Damaged | Unknown | Damaged | Not damaged | Not damaged | Not damaged |
| Containment integrity | Not damaged | Not damaged | Not damaged | Not damaged | Not damaged | Not damaged |
| Core cooling system 1 (ECCS/RHR) | Not functional | Not functional | Not functional | Not necessary | Not necessary | Not necessary |
| Core cooling system 2 (RCIC/MUWC) | Not functional | Not functional | Not functional | Not necessary | Not necessary | Not necessary |
| Building integrity | Damaged | Not damaged | Damaged | Not damaged | Not damaged | Not damaged |
| Environmental effect | 15 microSievert/hour at 13:55AM |
| Pressure vessel, water level | Unknown | Low (recovering) | Unknown | Safe | Safe | Safe |
| Pressure vessel, pressure | Stable | Unknown | Stable | Safe | Safe | Safe |
| Containment pressure | Stable | Increasing | Stable | Safe | Safe | Safe |
| Sea water injection | Suspended | Done | Performed | Not necessary | Not necessary | Not necessary |
| Containment venting | Performed | Preparing | Performed | Not necessary | Not necessary | Not necessary |
| Evacuation area | 20 km |
| INES | Level 4 (estimated by NISA) |